RECENTLY COMPLETED WORKS
BOWEN BASIN AND WESTERN AUSTRALIA
Electrical, high voltage and electric drive scopes delivered on mining, industrial and commercial sites — from substation infrastructure through to fleet availability programs.
Supply and installation of site substation infrastructure, including switchgear, terminations and protection, tested and commissioned before energisation.
HV
HV ring main
Sector :
Mining
Region :
Bowen Basin
Supply and installation of 11kV 800a adaptor plugs and pole top terminations to 300mm^2 12-22kV cabling to complete sites HV ring main.
HV
11kV receptacle refurbishment
Sector :
Mining
Region :
Bowen Basin
Compete strip down, test and re-assembly using new components of 11kV 800a bolted adaptor plugs.
Electrical contracting
Switchboard compliance upgrade
Sector :
Commercial
Region :
Mackay
Existing switchboard infrastructure upgraded to current compliance requirements, with testing, documentation and certification completed on handover.
Electrical contracting
Safety PLC installation
Sector :
Industrial
Region :
Bowen Basin
Safety PLC system supplied, installed and commissioned, including field wiring, functional testing and verification against the design specification.
Electrical contracting
Lighting upgrades
Sector :
Commercial
Region :
Mackay
Lighting replacement and upgrade across site facilities, delivered in stages around occupancy with minimal disruption to normal operations.
HV/Electrcial Contracting
Substation & controls
Sector :
Industrial
Region :
Bowen Basin
Installation of new mine de-watering control panel and custom 11/0.433kV
Schnieder kiosk substation. All design and commissioning works completed.
Electric drive
Fleet availability program
Sector :
Mining
Region :
Bowen Basin
Root-cause fault finding program across an electric drive fleet, working through fault history to correct underlying conditions rather than replace components.
HV/Electrcial Contracting
Cable terminations
Sector :
Mining
Region :
Bowen Basin
HV cable terminations landed and tested into switchgear, with control supply and earthing installed and commissioned before energisation.